Altered Service Application

Service Rules and Regulations

Application for Altered Service

Application for non-Residential Altered Service or Added Load

Notice on new Electrical Inspection

If you need to change your electrical service, it's necessary to fill out and submit the application for altered service. Applications take 2 to 8 weeks to process, depending upon complexity of job and current number of applications being processed.

Here's what you'll need:

  • Application for altered service/added load.
  • Application for Credit if PUD 3 account is not currently in your name (unless you have previously completed the Application for Credit with PUD 3).

To Avoid Future Problems:
There is a fee for unauthorized disconnection, reconnection, and/or meter tampering. Customers who have disconnected or reconnected their power without proper authorization and/or have meters that have been tampered with or had their seals cut will be billed a minimum $100.00 tampering fee.

Keep the following things in mind when determining the placement of your meter:

  • Before construction, keep in mind that PUD personnel must have access to the meter every month.
  • The meter base must be installed on the outside of the building in a location that is easy to access.
  • Avoid placing your meter base over 5 feet off the ground; in a carport or other areas that may be enclosed later; in the same area as your dog will be kept; or anywhere you want absolute privacy.
  • Copy of Building Permit and Approval Number from the State Electrical Inspector are required, but not necessary to submit application for estimate. Click Here
  • Plot Plan of Development or Drawing of Property (Need location of septic, poles, mobile, home (entrance), and temporaries).
  • Copies of current recorded deed or current recorded contract of sale and parcel number for property.
  • Property corners clearly marked.

 